Estimated cost of the foundation for the printer?

The foundation is filled in the traditional way. You can find out the cost of the foundation device by calculating the construction volumes for the project.

How to transport and install the printer? Do you need a manipulator or can you do without it?

You can use your hands, but you need to take into account that the portal beam of the S-6044 LONG printer weighs more than 200 kg. Therefore, its lifting and installation by hand will require the participation of several people.

As for the S-300 printer, no additional equipment is required to install it directly on the foundation, the equipment is easily assembled

Is it possible to fill the foundation with a printer (light concrete with foam glass)?

Theoretically, yes, the question of the profitability of this activity - is it not easier to pour a concrete pump?

Is it possible to make a house in parts and how to assemble it later?

There are 2 approaches to printing on construction printers: field and workshop version. During workshop production, buildings are printed in parts with their subsequent assembly on the construction site. We made the first residential house in Russia, presented in Yaroslavl, exactly like this.

Requirements for the printer installation site?

The printer prints on the foundation, that is, the site must be prepared in advance. The equipment is installed directly on the foundation, or outside the perimeter - for example, on screw piles, then adjusted.

Tell me, what are the requirements for a "field" version of the printer that can print all the walls at once?

The printer installed on the construction site can also work at subzero temperatures. The S-300 and S-500 printers of our production are completely waterproof. This equipment is highly productive, extremely reliable and maintainable.

Temperature conditions of construction?

We printed on the foundation at a temperature of -7 °C in winter with antifreeze additives. Theoretically, it is possible to print up to -25 °C.

To what extent is the device already ready for operation (or only in development)?

The "AMT" line of construction printers is a mass-produced industrial equipment. There are all the necessary certificates for the entire series of printers.

The equipment is delivered to the customer in a debugged state, tested for operability.

We intend to build houses, accordingly, we need equipment for this purpose. Advise me.

It should be borne in mind that there are 2 ways to print on construction 3D printers:

Workshop for printing elements (parts) of buildings and structures with subsequent assembly on the foundation.
Then assembly on site and filling with ready-mixed concrete in the cavities of the walls. The most suitable printer is S-6044 LONG   

Printing directly on the foundation.
To do this, you need to select a printer according to the size of the house. Most often it is the S-300 and S-500 in various modifications.